Yesterday was all about prepping to begin sewing and embroidering. Cleaned up digitizing, prepped all the materials, and got my files on the ScanNCut and Luminaire. The backs and fronts, to be quilted, are prepared along with the batting. The stabilizer is cut so that I can stitch out all the placement lines this morning. The 3 lining fabrics have been cut, pinned, and are also ready to sew today. I plan to quilt all three backs first, then embroider the fronts. I chose to keep my front designs separate files to allow for flexibility on future projects.


