Progress with community project….

Yesterday was all about prepping to begin sewing and embroidering. Cleaned up digitizing, prepped all the materials, and got my files on the ScanNCut and Luminaire. The backs and fronts, to be quilted, are prepared along with the batting. The stabilizer is cut so that I can stitch out all the placement lines this morning. The 3 lining fabrics have been cut, pinned, and are also ready to sew today. I plan to quilt all three backs first, then embroider the fronts. I chose to keep my front designs separate files to allow for flexibility on future projects.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s